Murrelektronik GmbH Prüfzentrum (4)
139 capabilities
Accredited since March 2023
Verified Nov 2026
One of 3,243 in Germany
Send one structured enquiry and we chase the reply for you. No cold email, no chasing.
Details
Grabenstraße 27
Oppenweiler 71570 , Germany
Oppenweiler 71570 , Germany
Accreditation
Active
DAkkS
D-PL-19306-01-00
Provides electromagnetic compatibility (EMC) testing and related cable assessments according to generic and product-specific standards, with additional electrical safety and product safety capabilities.
Accreditation Details
Accreditation Body
DAkkS
Number
D-PL-19306-01-00
Status
ActiveSince
16 March 2023
Accreditation is granted under EU Regulation 765/2008 and assessed against ISO/IEC 17025. Data sourced from official DAkkS records.
Download Scope PDF
Test Capabilities (139)
| Standard Reference | Description | Category |
|---|---|---|
| DIN EN 478 (2018-04) | NF EN 478 | Climate / Temperature Cycling |
| IEC 60947-8 | IEC 60947-8 | Climate / Temperature Cycling |
| DIN EN 12043 (2015-02) | DIN EN 12043 | Concrete / Cement |
| DIN EN 55011: 2018 | DIN EN 55011: 2018 | EMC / EMI Testing |
| DIN EN 55014-1 (2018) | UNE-EN 55014-1 | EMC / EMI Testing |
| DIN EN 55014-1: 2018 | DIN EN 55014-1: 2018 | EMC / EMI Testing |
| DIN EN 55014-2 (2016) | UNE-EN 55014-2 | EMC / EMI Testing |
| DIN EN 55014-2: 2016 | DIN EN 55014-2: 2016 | EMC / EMI Testing |
| DIN EN 55016-2-1 | DIN EN 55016-2-1 | EMC / EMI Testing |
| DIN EN 55022: 2011 | DIN EN 55022: 2011 | EMC / EMI Testing |
| DIN EN 55024: 2016 | UNE-EN 55024 | EMC / EMI Testing |
| DIN EN 61000 4-8 | UNE-EN 61000-4-8 | EMC / EMI Testing |
| DIN EN 61000-3-2 (2019) | UNE-EN 61000-3-2 | EMC / EMI Testing |
| DIN EN 61000-3-3 (2020) | EN 61000-3-2 and EN 61000-3-3 | EMC / EMI Testing |
| DIN EN 61000-4-11 (2019) | 1.7 AC Voltage Dips and Short EN 61000-4-11:2020 | EMC / EMI Testing |
| DIN EN 61000-4-13 | UNE-EN 61000-4-13 | EMC / EMI Testing |
| DIN EN 61000-4-14 | DIN EN 61000-4-14 | EMC / EMI Testing |
| DIN EN 61000-4-17 | DIN EN 61000-4-17 | EMC / EMI Testing |
| DIN EN 61000-4-2 | 1.4 Electrostatic Discharge EN 61000-4-2 :2009 | EMC / EMI Testing |
| DIN EN 61000-4-27 (2009) | DIN EN 61000-4-27 | EMC / EMI Testing |
| DIN EN 61000-4-28 | DIN EN 61000-4-28 | EMC / EMI Testing |
| DIN EN 61000-4-29 | power port EN 61000-4-29 | EMC / EMI Testing |
| DIN EN 61000-4-3 (2011) | UNE-EN 61000-4-3 | EMC / EMI Testing |
| DIN EN 61000-4-4 | 1.5 Electrical Fast Burst Transient EN 61000-4-4:2012 | EMC / EMI Testing |
| DIN EN 61000-4-5 | 1.6 Voltage Surge Immunity EN 61000-4-5:2014 +A1:2017 | EMC / EMI Testing |
| DIN EN 61000-4-6 | UNE-EN 61000-4-6 | EMC / EMI Testing |
| DIN EN 61000-4-9 | UNE-EN 61000-4-9 | EMC / EMI Testing |
| DIN EN 61000-6-1 | This section includes generic and EN 61000-6-1:2007 | EMC / EMI Testing |
| DIN EN 61000-6-2 (2006) | UNE-EN 61000-6-2 | EMC / EMI Testing |
| DIN EN 61000-6-3 | UNE-EN 61000-6-3 | EMC / EMI Testing |
| DIN EN 61000-6-4 | to basic standards included in EN 61000-6-4:2007 including scope line lists this standard | EMC / EMI Testing |
| DIN EN 61326-3-1 (2018) | DIN EN 61326-3-1 | EMC / EMI Testing |
| DIN EN 62026-2 | DIN EN 62026-2 | EMC / EMI Testing |
| EN IEC 61000-4-6 (2023-07) | IEC 61000-4-6: 2013 | EMC / EMI Testing |
| IEC 61000-3-2: 2014 | IEC 61000-3-2: 2014 | EMC / EMI Testing |
| IEC 61000-3-3 (2013) | IEC 61000-3-3 | EMC / EMI Testing |
| IEC 61000-4-11: 2004 | IEC 61000-4-11: 2004 | EMC / EMI Testing |
| IEC 61000-4-13: 2002 | IEC 61000-4-13: 2002 | EMC / EMI Testing |
| IEC 61000-4-14: 2009 | IEC 61000-4-14: 2009 | EMC / EMI Testing |
| IEC 61000-4-17: 2009 | IEC 61000-4-17: 2009 | EMC / EMI Testing |
| IEC 61000-4-27: 2000 | IEC 61000-4-27: 2000 | EMC / EMI Testing |
| IEC 61000-4-28: 2000 | IEC 61000-4-28: 2000 | EMC / EMI Testing |
| IEC 61000-4-29: 2000 | IEC 61000-4-29: 2000 | EMC / EMI Testing |
| IEC 61000-4-2: 2008 | IEC 61000-4-2: 2008 | EMC / EMI Testing |
| IEC 61000-4-3: 2006 | IEC 61000-4-3: 2006 | EMC / EMI Testing |
| IEC 61000-4-4: 2012 | IEC 61000-4-4: 2012 | EMC / EMI Testing |
| IEC 61000-4-5: 2005 | IEC 61000-4-5: 2005 | EMC / EMI Testing |
| IEC 61000-4-8: 2009 | IEC 61000-4-8: 2009 | EMC / EMI Testing |
| IEC 61000-4-9: 2016 | IEC 61000-4-9: 2016 | EMC / EMI Testing |
| IEC 61000-6-1 (2005) | IEC 61000-6-1 | EMC / EMI Testing |
| IEC 61000-6-2: 2005 | IEC 61000-6-2: 2005 | EMC / EMI Testing |
| IEC 61000-6-3: 2006 | IEC 61000-6-3: 2006 | EMC / EMI Testing |
| IEC 61000-6-4: 2006 | IEC 61000-6-4: 2006 scope line lists this standard | EMC / EMI Testing |
| IEC 61000-6-8 (2020) | IEC 61000-6-8 | EMC / EMI Testing |
| IEC 61131-2: 2020 | IEC 61131-2: 2020 | EMC / EMI Testing |
| IEC 61204-3: 2016 | IEC 61204-3: 2016 | EMC / EMI Testing |
| IEC 61326-1: 2012 | IEC 61326-1: 2012 | EMC / EMI Testing |
| IEC 61326-2-5: 2012 | IEC 61326-2-5: 2012 | EMC / EMI Testing |
| IEC 61326-3-1 (2017) | IEC 61326-3-1 | EMC / EMI Testing |
| IEC 62026-2 (2008) | IEC 62026-2 | EMC / EMI Testing |
| IEC 62153-4-3 (2013) | IEC 62153-4-3 | EMC / EMI Testing |
| IEC 62153-4-4 (2015) | IEC 62153-4-4 | EMC / EMI Testing |
| IEC 62153-4-9 (2024) | IEC 62153-4-9 | EMC / EMI Testing |
| VDE 0878-24 (2011-09) | VDE 0878-24 | EMC / EMI Testing |
| DIN EN 13263-1 (2009-07) | UNE-EN 13263-1 | Electrical |
| VDE 0435-2021 (2012) | VDE 0435-2021 | Electrical |
| VDE 0660-100 (2015) | VDE 0660-100 | Electrical |
| VDE 0660-102 (2014) | VDE 0660-102 | Electrical |
| VDE 0660-109 (2015) | VDE 0660-109 | Electrical |
| VDE 0660-117 (2013) | VDE 0660-117 | Electrical |
| VDE 0660-214 (2014) | VDE 0660-214 | Electrical |
| VDE 0660-302 (2013) | VDE 0660-302 | Electrical |
| VDE 0843-20-2-5 (2013) | VDE 0843-20-2-5 | Electrical |
| DIN EN 60947-5-3 | DIN EN 60947-5-3 | Electrical Safety |
| EN IEC 60947-3 (2021) | IEC 60947-3 | Electrical Safety |
| IEC 60947-1 | IEC 60947-1 | Electrical Safety |
| IEC 60947-4-1 | IEC 60947-4-1 | Electrical Safety |
| IEC 60947-4-2 (2020-06) | IEC 60947-4-2 | Electrical Safety |
| IEC 60947-4-3 | IEC 60947-4-3 | Electrical Safety |
| IEC 62041 (2017-08) | IEC 62041 | Electrical Safety |
| VDE 0411-500 (2008-04) | VDE 0411-500 | Electrical Safety |
| VDE 0570-10 (2020-11) | VDE 0570-10 | Electrical Safety |
| VDE 0838-2: 2015 | VDE 0838-2 | Electrical Safety |
| VDE 0838-3 (2020-07) | VDE 0838-3 | Electrical Safety |
| VDE 0839-6-1 (2019-11) | VDE 0839-6-1 | Electrical Safety |
| VDE 0839-6-2 (2019-11) | VDE 0839-6-2 | Electrical Safety |
| VDE 0839-6-3 (2022-06) | VDE 0839-6-3 | Electrical Safety |
| VDE 0839-6-4 (2020-09) | VDE 0839-6-4 | Electrical Safety |
| VDE 0847-4-13 (2016-10) | VDE 0847-4-13 | Electrical Safety |
| VDE 0847-4-14 (2010) | VDE 0847-4-14 | Electrical Safety |
| VDE 0847-4-17 (2005-04) | VDE 0847-4-17 | Electrical Safety |
| VDE 0847-4-28 (2009-12) | VDE 0847-4-28 | Electrical Safety |
| VDE 0847-4-3 (2011-04) | VDE 0847-4-3 | Electrical Safety |
| VDE 0847-4-8 (2010-11) | VDE 0847-4-8 | Electrical Safety |
| VDE 0877-16-2-1 (2019-11) | VDE 0877-16-2-1 | Electrical Safety |
| VDE0847-4-9 (2001-12) | VDE0847-4-9 | Electrical Safety |
| VDE 0660-208 (2014) | VDE 0660-208 | Installation / Wiring Testing |
| DIN EN 349 (2008-09) | DIN EN 349 | Other |
| DIN EN 417 (2012) | DIN EN 417 | Other |
| DIN EN 474-1 (2020-03) | DIN EN 474-1 | Other |
| DIN EN 474-11 (2010) | DIN EN 474-11 | Other |
| DIN EN 474-2 (2010) | DIN EN 474-2 | Other |
| DIN EN 474-5 (2013) | DIN EN 474-5 | Other |
| DIN EN 474-6 (2010) | DIN EN 474-6 | Other |
| DIN EN 474-8 (2010) | DIN EN 474-8 | Other |
| DIN EN 60214: 2015-04 | DIN EN 60214: 2015-04 | Other |
| DIN EN 60947-8 | DIN EN 60947-8 | Other |
| DIN EN 61131-2: 2008 | DIN EN 61131-2 | Other |
| DIN EN 61131-9: 2015-02 | DIN EN 61131-9: 2015-02 | Other |
| DIN EN 61812-1 (2012) | DIN EN 61812-1 | Other |
| DIN EN 62041 | DIN EN 62041 | Other |
| DIN EN 751-1 (1997-05) | DIN EN 751-1 | Other |
| DIN EN 60947-1 | DIN EN 60947-1 | Product Safety (IEC 60335, IEC 62368) |
| DIN EN 60947-3 | EN 60947-3 | Product Safety (IEC 60335, IEC 62368) |
| DIN EN 60947-4-1 | UNE-EN 60947-4-1 | Product Safety (IEC 60335, IEC 62368) |
| DIN EN 60947-4-2 | UNE-EN 60947-4-2 | Product Safety (IEC 60335, IEC 62368) |
| DIN EN 60947-4-3 | EN 60947-4-3 | Product Safety (IEC 60335, IEC 62368) |
| DIN EN 60947-5-2 | DIN EN 60947-5-2 | Product Safety (IEC 60335, IEC 62368) |
| DIN EN 61204-3 (2018) | DIN EN 61204-3 | Product Safety (IEC 60335, IEC 62368) |
| DIN EN 61326-2-5 (2013) | DIN EN 61326-2-5 | Product Safety (IEC 60335, IEC 62368) |
| IEC 60947-5-2 (2019-10) | IEC 60947-5-2 | Product Safety (IEC 60335, IEC 62368) |
| IEC 60947-5-3 (2013-08) | IEC 60947-5-3 | Product Safety (IEC 60335, IEC 62368) |
| IEC 61131-9 (2013-09) | IEC 61131-9 | Product Safety (IEC 60335, IEC 62368) |
| IEC 61812-1 | IEC 61812-1 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0411-509 (2015-02) | VDE 0411-509 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0557-3 (2018) | VDE 0557-3 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0660-107 (2017-02) | VDE 0660-107 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0660-2026-2 (2021-02) | VDE 0660-2026-2 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0847-4-11 (2019-06) | VDE 0847-4-11 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0847-4-27: 2009 | VDE 0847-4-27: 2009 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0847-4-29 (2001-10) | VDE 0847-4-29 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0847-4-4 (2013-04) | VDE 0847-4-4 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0847-4-5 (2019-03) | VDE 0847-4-5 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0847-4-6 (2014-08) | VDE 0847-4-6 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0875-14-1 (2012-05) | VDE 0875-14-1 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0875-14-2 (2016-01) | VDE 0875-14-2 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0878-22 (2011-12) | VDE 0878-22 | Product Safety (IEC 60335, IEC 62368) |
| VDE 0875-11 (2022-05) | VDE 0875-11 | REACH Substance Testing |
| VDE 0847-4-2 | VDE 0847-4-2 | Tensile / Compression / Flexural |
Send an Enquiry
Request a quote, ask about capacity, or discuss your testing requirements directly with this lab.