Railway Coach Bogie Behavior Assessment
This standard specifies the behavior and performance requirements for Y25 bogie type coaching stock bogies, focusing on derailment resistance, curving performance, and stability characteristics. It provides test methods and acceptance criteria for evaluating bogie performance through simulation, calculation, and track testing to ensure safe operation across varying track geometries and speeds. Compliance verification is mandatory for coach manufacturers, bogie suppliers, and infrastructure operators to maintain interoperability and prevent accidents. Accredited testing ensures comprehensive evaluation against standardized criteria, reducing operational risks and supporting evidence-based vehicle certification.
What it measures
- Derailment coefficient and safety margin against derailment
- Lateral and vertical wheel loads on curves
- Curve-climbing behavior and stability
- Dynamic response to track irregularities and switches
- Forces on bogie frame and guidance components
Showing 1,526–1,550 of 1,632 labs
VIRLAB
ActiveVWR International
ActiveVectoflow
ActiveVintec Laboratories
ActiveVistec Electron Beam
ActiveWENZEL Metrology
ActiveWIKA Alexander Wiegand SE &
ActiveWIN Messmittel und Service
ActiveWSP UK
ActiveWTLAB
ActiveWaagen-Dienst Kirste
ActiveWaagen-Jöhnk
ActiveWaagen-Kissling
ActiveWaagenfachhandel Hilke
ActiveNo matching labs found.